Transcript 0:00 There's just something so beautifully simple, that it is all comes back to boiling water to turn turbines. We're just finding different, different ways of doing it, more, uh, higher efficiency, 0:10 complex, beautiful ways of doing it. [upbeat music] Welcome to Mission Critical. My name's Logan Jones. Uh, I'm one of the hosts. 0:23 And if you're new to Mission Critical, we started this series because we really wanted to kinda document this time in history, this next technological revolution, uh, as artificial intelligence impacts some of those critical industries in our nation. 0:38 So things like energy, advanced manufacturing, uh, and space and defense. So today I'm on my way down to Clinton, Tennessee to do a tour of the Vol Ren fossil plant. 0:50 So that is a decommissioned coal plant that is owned by the Tennessee Valley Authority, and we've been invited down because the TVA has actually partnered with Type One Energy, which is a nuclear fusion company, uh, to build a proof of concept fusion reactor in this decommissioned coal plant. 1:08 It feels so poetic that a- an old coal plant is gonna be driving forward this next, this next source of energy that has been talked about for, for decades. 1:17 So before we dive into this, I just wanna give a quick shout-out to the sponsors that support Mission Critical. 1:23 A special thank you for helping get Mission Critical off the ground to Valant, which is an AI platform that helps Mission Critical companies qualify, respond to, and win more RFPs, and Able Construction, a fourth generation family-owned construction company building some of the most complex projects across the Midwest and Southeast. 1:42 Links to both are in the description. All right, Tony, there's a running joke, uh, about fusion energy, that it's always been 30 years away. 1:52 Uh, and now we're seeing just a lot more private investment going into the space, utilities like the TVA are now, you know, putting resources towards this. 2:01 And it makes you think, when you think of a utility like the TVA, typical utilities are very conservative. Yeah. And it makes you wonder, okay, well what has... What's going on now? 2:10 What's changed now that somebody like the TVA wants to start putting resources towards fusion? 2:15 So I thought we could just start the conversation off talking about this time in history and this moment, and why you guys have started taking steps towards fusion energy. Well, and, and, and you're right. 2:27 You're right about the, uh, always 30 years away. The science hasn't really changed. I mean, what has really changed over the last several years is some of the infrastructures that support fusion. 2:40 Uh, in my opinion, I, I do feel that the advancements that we've seen in the computers nowadays, uh, have, are ha- having probably the, the biggest impact or biggest advancement that we're seeing. 2:53 Um, we look at, uh, our case with the, um, Infinity Project. Our stellarator, uh, design from Type One Energy leveraged the Oak Ridge National Labs supercomputer. Mm. 3:07 And it's able to do these complex calculations so fa- so, so much faster than they did in the past. 3:14 They're able to have these sophisticated models that are able to determine and evaluate the operating parameters of the stellarator. 3:22 So when you're looking at optimizing or designing the angle of the magnetic confinement, the super to computers are able to do that calculation- Mm... in, in, in a day, where it would take a year, uh, in the past. 3:38 So we're seeing the advancement in, in computers. I also see an advancement in manufacturing. 3:45 Y- you know, the tools that we use in our shops, the C and D machines, they, they have computer applications now involved with them. 3:52 They have AI associated with them, that are able to do a much quicker manufacturing, machining of our components, and much, you know, better quality as well. You got, you got laser cutting tools. 4:07 You have, uh, laser alignments. Um, you have different, um, manufacturing techniques that can make materials and, and equipment much faster. 4:19 In, in the olden days, you used to have a large machinery that would have to be forged, or you would need castings, and that, that takes time, and, and then time in construction world is, is money. Mm. 4:33 So the advancement of manufacturing to get e- you know, the equipment faster is helping with the advancement of fusion as well. Mm-hmm. And, um, 4:46 the f- finally, I, I see advancements in, in the area of, um, material science, and in two areas of material science. The environment that fusion needs to operate in is a very harsh environment. 5:01 So the material that has to withstand the temperatures, the pressures, it gives off high energy particles and neutrons. The neutron bom- bom- bombardment hardens the material. 5:14 We want these machines when we build them to last a long time. Mm-hmm. 5:18 So material science has to evaluate the environment that they're gonna be operating in and, and come up with a design that will be able to handle that. Mm-hmm. 5:28 Uh, and the, and, and then, and the other aspect of material science is the technology to evaluate the, um, material that you're using. 5:39 These are, these are large pieces of equipment, and being able to verify they have the right quality in their manufacturing could be a challenge. Mm. 5:49 So one of the things we have within the, uh, the project is we'll be building a high heat flux energy beam that you can, you'll be able to see down in the machine shop where it's gonna go. 6:01 And that will be able to test the material to verify that it meets the requirements to be able to handle, you know, the fusion, um, situation. 6:11 So those are the things that I see why- that have improved over the last several years that makes, you know, fusion viable in today's world. 6:20 Well, something that really stands out to me that I feel like is just so in- such an interesting dynamic is the, is the concept of compute, and how compute is on the back end helping us to get to the point where we can run these calculations and, uh, make these predictions and build these models using things like the supercomputer at Oak Ridge. 6:39 But then on the back end, we need more energy to power compute. There's just a massive demand for new power, and so it's funny how it's kind of happening on both ends. 6:48 It's helping us build this new production, and then it's also he- you know, it's gonna be a benefactor of that new energy once it comes online. I just think that's such an interesting concept. 6:56 It, it, the concept is, is all tied together. And you're exactly right. So when you look at the demand for, for energy within the United States, you have demand growth that's occurring. 7:08 And, and so you need to get generating assets constructed and built that will be able to meet those increasing energy demands. 7:17 And then you have your AI and data centers that are creating even a larger demand for the electricity. So as it ties into the future, 7:29 the supply of energy sources has constraints, has constraints to, you know, the infrastructure for pipelines, for, you know, natural gas flow. You have oil, um, production. 7:42 Some of the production requirements for fission, it takes time to absorb that much growth. Mm-hmm. 7:51 So you look at other energy sources, such as fusion, as a possible solution that can grow at a faster rate than maybe some of the other traditional energy supply sources. 8:03 Yeah, it's just such an interesting time right now where artificial intelligence and the energy demands of artificial intelligence are essentially driving, you know, investment into new sources, existing sources. 8:16 And my hope is that, you know, humanity as a whole benefits from- Yeah... more abundant power, and that's really why I'm so fascinated with what the TVA is kind of doing in this space. 8:25 And I, I wanted to, um, just before we really get into this conversation, kind of talk about your position a little bit. Okay. 8:31 Um, so your title, uh, Executive Sponsor for the Infinity Project here at the TVA, I'd, I'd love to understand how you explain that to somebody who has- [laughs]... no concept of fusion or the energy sector. 8:41 How, how do you explain it to your friends who don't work within the industry? 8:44 The way I ex- describe my position is, is I gotta understand the technology, and then I have the responsibility to communicate that through the TVA, through the board of directors, through the senior leaders, a- and, and be understand where the risks are, um, both the financial risks and the, uh, production risks associated with this, this, um, project. 9:08 Mm-hmm. Being able to, you know, see where those challenges are, I also have, you know, the responsibility to ensure that we are putting the proper due diligence into those open questions. 9:25 You know, fission is new, excuse me, fusion is new technology, so as we're going through the design process, there's, there's a lot of questions that gotta be 9:37 vetted out a- and thoroughly understood to eliminate some of the risks that you, challenges you might have in the future. 9:45 Being able to see those challenges on behalf of TVA, getting third-party reviews, getting independent evaluations, putting in tests or other things to validate assumptions that are being made, you know, those, those are part of my role as the executive sponsor. 10:03 And additionally, you know, we are in the business to, you know, this project is to build fusion plants. Mm-hmm. 10:11 You know, when there's road, there's barriers when we s- come into some of the challenges, you know, stepping in and helping out the team work through the problems or to find other ways to s- come up with solutions for some of the challenges you have with the project. 10:27 Mm-hmm. Um, so eliminating some of the roadblocks and the barriers that the project may come up with. 10:32 Yeah, and I feel like your experience just going back a number of decades in this sector and with the TVA can lend itself to being able to serve in a leadership capacity for an entirely new source of energy for the TVA and, and really the country as a whole. 10:46 And so I, I, I'm just so interested in going back a couple of decades to when you started with the TVA or in this sector as a whole. 10:54 Could you have imagined that you were gonna be a fusion influencer for the TV, [laughs] for the TVA? [laughs] 'Cause I mean, this is... I mean, even t- five, 10 years ago, is this something that you could have foreseen? 11:04 No, no. I, I, m- m- my, my, my career, um, started, uh, right out of college as a, you know, projects engineer. Mm-hmm. So, um, g- working in the construction area in the utilities, and I enjoyed that. 11:20 I enjoyed working on projects, working on construction. Uh, however, earl- soon after, you know, getting in those fields, I, I entered into the fission nuclear field, coming up through operations. 11:33 Um, and working in that environment for, you know, about 30 years, uh, up to, you know, the site vice president of Sequoia, the site vice president of Watts Bar, fission was my world. I kn- I was aware of fusion. 11:50 I mean, I watched, um, the shows. I was educated on the technology, and I was excited about fusion coming into reality within my lifetime, but I never foresaw You know, being the executive sponsor for this project. 12:09 Yeah. 12:09 And I feel like, um, especially on, it just, the TVA just, y- you exist in such an interesting zone where you're a utility providing power to residential homes, commercial facilities, industrial facilities, uh, at very reliable power at, uh, at an affordable rate, um, in perpetuity. 12:27 And so to be able to look at new technologies and to weigh which one should we look into next, how do we, how do we make the case for financial viability for, uh, working with Type One on Infinity One? 12:39 But then also, I... It just... At the same time, this new technology, it, it takes a utility to take a chance on it to, for it to go grid scale. 12:49 At the end of the day, you can simulate it as much as you possibly want to. 12:52 You can simulate it to death, but to actually be able to put it into practice, you need a utility like the TVA to come along and actually take a chance with it. 13:00 And so I just feel like to be able to serve as both a catalyst, but to also maintain those rates for your customers at the same time, can you talk a little bit more about that, about how the TVA thinks about weighing those two at the same time? 13:13 I mean, our, our mission is to serve the people in the valley. And, and when you look at that, uh, mission, it's not only just low cost. Mm-hmm. You know, we... 13:24 You look at what our CEO, Don Mall, he, he, he wants a reliable grid energy supply. He wants the resiliency to be able to handle, you know, these challenges, you know, a day like today when it's very cold out there. 13:40 He wants a reliable grid, people to depend on their energy, uh, supply. So it is about cost, but it is also on reliability and resiliency of, uh, of our energy grid. When you look at... 13:57 For fusion, when we assessed it, about three years ago, we started really diving into are we ready to take this theory into practical application? Mm-hmm. 14:10 And, and so you, you evaluate, you know, the construction costs, and, um, so you, you, you look at... 14:16 And you get some outside independent, you know, consultants to say, you know, "A fusion power plant will cost X amount of money to build." 14:26 It's gonna have about a 25 to 30-year lifespan, so you amortize that out over that period of time, and that's your, you know, construction cost amortized for a year. Mm-hmm. 14:37 We, we, we kind of have a good understanding of what the operation and maintenance costs will be. It's very similar to, you know, the conventional plants, a boiler or a combined cycle plant. 14:49 So we, we can, you know, apply a good estimation on what our annual operation and maintenance costs would be. 14:58 Fuel costs become a little bit more trickier because y- you, you understand what the fuel cost is now, but you also have to understand what the variability, uh, of that fuel cost will be in the future. 15:12 You look back, you know, several years ago, some of the supply and demand challenges with natural gas, you saw extreme prices moving up and down with the natural gas price. Mm-hmm. When you look at fusion, 15:27 the fuel costs are independent of most outside influences. Mm-hmm. It, it's not dependent on, you know, other countries. 15:39 You're not dependent on pipelines or supply restrictions, and so you got a stable fuel price in the future. 15:50 You do the, the calculations on how fusion compares to some of our technology that we have generating electricity today, and it's very favorable. Construction costs are gonna be higher. It's a first- Mm-hmm... 16:07 of a ever plant for a, for fusion, but everything else should be predictable, and that price for construction will come down. You know, w- w- not necessarily... 16:20 TVA's not necessarily here to build the, um, the support structure for the fusion indust- industry, but being out there in front of building the first ones- Mm... it will naturally occur. 16:36 Y- people will see that this is technology. It is, can be done, the technology works, and the infrastructure will start growing significantly- Mm-hmm... I mean, tremendously a- right after that. Mm-hmm. 16:50 And so we'll be the catalyst when we're done. Mm-hmm. 16:54 And speaking of being the catalyst, you know, we got to do the tour of the full Bull, Bull Run Facility, and one, I mean, being in these huge industrial facilities like this is always just so awe-inspiring because of the sheer size of it. 17:06 But what really struck me is how you all have partnered with Type One Energy to use an existing facility that was used for power production via coal, and now you're gonna be using it to, you know, prove out calculations for fusion energy. 17:21 So I'd love to, kind of a two-part question here, understand how you guys are thinking about, uh, Infinity One, kind of proving out the concept, and then what the plan is with Infinity Two, and how you guys evaluate the economics of this because it's an interesting deal. 17:36 You guys are bringing the facilities to the table. Yep. Type One is bringing the designs to the table. Oak Ridge is helping run a lot of the calculations. 17:44 So I'd love to just understand kind of the structure of that from an economics perspective and how, how you all as a utility are able to make that work. 17:51 So for the economics, breaking up the different projects that, uh, are gonna be coming down the, the, the process, so Infinity One will be funded by Type One Energy. Mm. 18:02 Um, that is proof of concept of their design and the model, uh, for the Oak Ridge supercomputer, you know, modeling of the stellarator design. They will own the design. They will own Infinity 1. 18:17 However, it'll be built on, you know, TVA's property, Bull Run facility, and the support, uh, equipment, you know, cooling water, electricity, that will be provided by TVA, which will be, you know, compensated for by Type One Energy. 18:36 The Infinity 2 will be a power plant that will be funded by TVA, and that will be constructed and built, um, with oversight from the design from the Ty- Infinity One project. 18:53 So the risks, the financial risks, as we talked about earlier, we have several steps within this phase of production to get Infinity 2 constructed- Mm... 19:09 that will have proof of concept of different systems and subsystems and modeling of their components. 19:17 And those will be funded by either Type One Energy, so like Infinity 1, or a combination of Type One Energy and TVA. So for that, it would be some of the fuel injection systems that we talked about. Mm-hmm. 19:32 Um, Department of Energy through grants, um, with designs from Oak Ridge National Labs for the high heat flux energy beam equipment that will be built, uh, down in the machine shop, Infinity 1. The... 19:46 It, it, it's the a- alignment with all these different companies that are sharing a lot of the cost and some of the, um, designs to get through these hurdles- Mm-hmm... to see the production of Infinity 2. Mm. 20:02 One thing when you, when you look at the partnerships that we have, it, it has grown so quickly over the last, you know, several months. 20:13 It was TVA and Type One Energy, and we had a, an agreement, a partnership together, and then Oak Ridge National Labs, Department of Energy, University of Tennessee, EPRI, um, State of Tennessee, the local, you know, the city of Clinton, the county, Anderson County. 20:34 You know, all these, these different groups are starting to partner up with this project. 20:41 And, and together, you're able to share expertise, you're able to share learnings, you're able to share cost to limit the, uh, risks associated with moving, progressing forward with this project. That's amazing. 20:54 And is... Speaking about partnerships, the, the ecosystem that's blossomed around here is, is unlike any other really. 21:01 I think you guys are rated the top state for nuclear across the country, which definitely shows with all of the private investment- Mm-hmm... 21:08 uh, all the DOE grants, but then also just the engagement with the university system is, and the community college system is, is, is so awesome to see. 21:16 And I know we mentioned on our tour downstairs, um, as Type 1 comes online and, and, and really tests itself, and then you're ready f- to start building Type 2. 21:25 Once Type 2 is fully operational, to be able to work with those partners and learn from and figure out how to maintain a, a very similar in size, uh, piece of machinery like Type 2 on, on Type 1 that's already there as more of like a test facility. 21:42 Mm-hmm. 21:42 I just think that's so interesting and, and very unique for the university students and for the other companies and for, for just the ecosystem to come in and actually prove the concept and, and test things and learn. 21:55 You're bringing up something that's e- very exciting. Um, we're gonna be going through these different deliberate steps to build Infinity 2. 22:06 However, to get there, you're gonna have a subsystem of, you know, like the fuel injection system. Mm-hmm. Um, we're evaluating whether to build a tritium, uh, supply subsystem. 22:21 We're looking at Infinity 1 as being a, a test machine and a training, uh, facility. So all this technology to get us to Infinity 2 will not go to waste. 22:35 It will be there to help train and develop and to research, to get future learnings 'cause- Mm... 22:42 the next evolution will be the improvements from Infinity 2 to the next ev- uh, generation of fusion units to continuously improve their designs. So what we're seeing at Bull Run in Eastern Tennessee 22:58 is this opportunity to develop this local community to be in- experts on the next generation of, of genera- electrical generation and, and fusion. Mm. So it's, it's very exciting time. 23:13 I love that you guys are taking this sort of, uh, ecosystem builder approach, and you're very open. 23:19 This was something that, um, we got to talk about in our last interview with the TVA, was just openness to collaboration and partnering with whether it's startups or government entities. 23:28 I think that's the path for success when you're trying to just start building again. 23:31 I mean, we're, we're building something brand new, and that is to establish an ecosystem is no small feat, and it takes a lot of different stakeholders to come in and, and invest in that. 23:42 And we talked a little bit about de-risking things by bringing in these partners and building these, uh, these collaborations. 23:48 I'm curious how the TVA kind of thinks about managing risks and uncertainty when it comes to investing in fusion technology at this stage. 23:57 I mean, what are things that you guys are, are looking out for that you're trying to hedge against, and how are you, how are you doing so? There's steps as we're going through this, um, you know, evolution to Infinity 2. 24:11 Um, we do... We are tracking some of those open questions and some of those challenges and, and, and, and evaluating on how they're getting resolved. When you look at, you know, extending 24:25 finances or economic risk, you gotta understand, you know, certain roadblocks like, hey, we gotta get an answer on this question before we wanna progress forward, um, with this design. 24:37 So Infinity, we, we, we do know that Type One Energy has a design that's proving. You know, the stellarators have been, 24:49 um, used in Germany and, um, the W7X machines has been successful at having stable plasma flow. Um, University of Wisconsin, uh, has a test, uh, stellarator at, at that facility, at that university. 25:05 So we do understand the design is good. However, those designs are at a cert- at a smaller scale, and those designs are slightly not optimized for power generation. So then you look at the supercon- computer modeling. 25:23 Mm-hmm. Supercomputer modeling set, um, determines, you know, how to build your magnets for, you know, magnetic confinement. Allows you to... How to build your vacuum chamber to get the flow angles of the plasma flow. 25:41 So those challenges exist in a computer, but you wanna make sure that it works in practice. Mm-hmm. So you build Infinity One, and then that validates that design. Mm-hmm. 25:55 Um, we talked about on the tour the, uh, um, the gyrotrons. Mm-hmm. These tools that are utilized to start the plasma flow. 26:05 They get the, uh, s- uh, heat up the, um, fuel to get it to the plasma state to allow the start of the fusion reactions. Gyrotrons have been around for a while. 26:20 They've been used on these test reactors, but at a much smaller scale. So y- when you're talking to a company who building the design to handle the size for Infinity Two, 26:34 you gotta show that they're proof of concept, so you evaluate how they test out, and they put them in practical applications to determine if they're gonna be able to perform the functions they need. 26:47 So y- y- you have a structure in place, and you, and you follow through that plan to evaluate the designs and s- s- you know, thoroughly answer those questions before you move forward. Mm-hmm. 27:00 And that's how you manage the economic risks as going through forward with the, um, this project. And, and, and when you mention the designs, because there's also... Uh, you've mentioned stellarator a few times. Mm-hmm. 27:11 And I know downstairs we talked about stellarator versus the tokamak technology- Oh, yeah... and why the TVA went more so with the stellarator, at least initially. 27:21 Um, and so, uh, can you go i- into the decision-making on that a little bit? 27:24 'Cause I'm-- I think the audience will be really curious just about the difference between the two and why the TVA preferred one over the other, at least for now. Yeah. 27:31 So the, the concept of creating the energy is the same. Mm-hmm. That fusion reaction, you know, creates the energy. 27:40 However, when you look at the tokamaks, the, the energy, the pressures are exerted in a pulse-type of function. So the energy is created in pulses. Mm. 27:54 A- and it gives a, you know, cyclical or oscillating energy, um, pulse. Mm. 28:02 Stellarators are fuel is injected in the plasma flow, and it's a stable, steady state, you know, production of the... or reaction of the, um, the fusion. 28:19 For our application for TVA, you know, the, the designs of having a, a, a stable, you know, thermal output o- of a machine which would then get converted over to a conventional power plant 28:34 allows you to optimize a- and fine-tune all the control systems and to operate everything at steady state a- and control and have a dependable, predictable amount of electricity that we put out to the grid. 28:49 So the stellarator, which provides that stable output of energy, was better for our application. Mm-hmm. Um, and that was one of the biggest-- That's- Mm... a big reason why we went with that design. 29:04 Speaking of designs and how you guys are kind of using Infinity One to prove out the concept to-- before moving on to Infinity Two, I think one of the things that makes me an optimist about this entire sort of initiative is 29:18 if we bring it back to compute, each time these simulations are run, when you actually have it happening in the real world, you guys are gonna be collecting a ton of data, and I assume that data's gonna be fed right back into the supercomputers to then further the research and the understanding of how these machines work and furthering things like material science and, and design. 29:37 I think that's probably one of the most exciting pieces of this that I can point to and be like, "Okay, why, why could this have not happened, you know, 10 years ago?" 29:45 We've just got a completely new paradigm when it comes to compute that gets me extremely excited about it. 29:52 And when you think of how quickly things are progressing on that front right now, it is, it is like nothing we've ever seen before in terms of a technological, uh, revolution. 30:02 And keeping that in mind, you guys have some milestones in terms of when you expect to start construction on Infinity One, when you wanna have things kind of running for the first time or, or at least have some of the, um, supporting systems up and, and ready to go. 30:18 Can you just kinda walk us through how you guys are planning from a time perspective of when some of this is gonna happen? Yeah. 30:24 Well, timing is perfect 'cause, um- As of this week, we just, uh, submitted our permits for the construction of, um, the Infinity1 project with the state of Tennessee, which is a, uh, uh, it is a l- huge milestone, uh, for us. 30:44 Understanding, you know, what the, the permit, um, requirements are gonna be, and what that process will look like for a, you know, commercial company 30:56 is, I- is a big variable that everybody needs to understand before they can pres- com- you know, jump into this industry. So what are the, what will the permits be? 31:07 So state of Tennessee has taken a, a, an, a forward approach to get in front of that question, and they've set up the prom, the, the parameters, they set up the process, and today we submitted the, uh, permit for Infinity1, for the construction of Infinity1. 31:25 Mm. 31:26 The manufacturing of the different components of Infinity1, those designs are at a point where they put many of them out for bid, um, through Type One Energy, and then some of them where they're gonna have TVA's power service shop, so some of our craftsmen down in our power service shop in Muscle Shoals, Alabama, they're gonna be taking on the construction of a lot of this, uh, work- Mm... 31:59 for Infinity1. We project that will occur late in 2026, and then 32:10 2027, about this time next year, then production will be, you know, moving very quickly with Infinity1 being facilitated and put together with the parts that are manufactured here in late 2027 at Bull Run. Mm. 32:28 Then you look at desi- uh, test running around middle of 2028, um, and doing the final test around October-ish, um, of 2028. Mm. And that's when Infinity1 will be complete. 32:46 In parallel with some of those timelines is where we see the start, potential start of Infinity2. Mm-hmm. 32:56 And then trying to get some overlap with some of the early permitting and some of the early construction work for Infinity2, 33:05 and then with the final design of the stellarator to be performed at the completion of the test run of Infinity1. Mm-hmm. 33:15 And I'm curious when it comes to Infinity2, you know, we, we discussed a lot on the tour of Infinity1, proof of concept, Infinity2 actually bringing power onto the grid. 33:25 How are you all planning from a, you know, a portfolio of, of power production? 33:30 How much, uh, output are you guys kind of planning for right now, and how does that fit into the rest of the portfolio that you guys operate? So the first, um, 33:42 the first assessment of where the stellarator, the Infinity2 output would be came in around, uh, 350 megawatts electrical. Mm. 33:53 When the engineers are looking at the thermal output that they expect from the fusion evolution, it, they're gonna get more thermal output than the 350 megawatt electrical net. 34:07 And also, some of the house loads that went into those early assumptions, when you look at, um, what it will really be, will be less. 34:17 So we, we, we project that it's gonna be higher than 350, maybe around 400 to 500 megawatts. 34:26 We will do an evaluation of the load onto the grid, and TVA has a process that any time you're adding load on the grid, it goes through our transmission group, and they assess how that will impact the balancing and the, and the loading of the grid, and we'll be entering in that process later this year. 34:46 Mm. Um, there was about, Bull Run was a little bit over 800 megawatts of electricity when it was running. Mm. And we're looking to, you know, try to get as much as that back with Infinity1. 35:00 Completion, I'm sorry, of Infinity2- Mm-hmm... um, on the grid. So it's about 400, 500 megawatts is where, um, we project Infinity2 to become at back load. Mm. 35:14 Super exciting, and I just think as we kind of wrap up the conversation here, just thinking about what a future with fusion energy looks like. 35:23 I mean, you know, when you think of when you started your career, coming in, what, what things looked like, and now, you know, the next generation is kind of coming in and trying to take things further, and you're getting to play a role in that at this stage in your career, I, I imagine is an incredibly exciting thing. 35:39 But for me, I, I really consider myself an optimistic futurist. 35:43 I think that, you know, the future is gonna take work to make incredible, but we have all the pieces there to, you know, achieve abundance and, and in the service of human flourishing. 35:54 I'm curious when you think of the future and a future where we have fusion energy, what does it look like to you? I'm aligned with you. I think that, you know, you gotta start fusion, you know, to get a future in fusion. 36:06 Um, exciting that we are starting fusion. Mm-hmm. I think it's gonna take a lot of work to build, um, the structure that we're gonna need. 36:18 Um, these power plants that we're, we're talking about are large, and they, and they take a lot of investment by companies to get into this industry. So they're gonna need to see, you know, a payback. 36:32 So they're gonna need to see other companies, you know, getting into the business. They're gonna see, "Hey, I want two stellarators over here. I want to order four over there. I want to order th-..." 36:43 So they're gonna need to see a, a viable design. They want to see, you know, positive output, and then they want to see the growth of the demand for stellarators. And then you'll see the supply chain follow suit. Mm-hmm. 37:00 And that, and that will take some time. Um, but when that happens, uh, it truly can take off. And, and then when you look at another aspect of, um, 37:11 of fusion energy, kind of like, um, like we talked about with the benefits of doing it at Bull Run. 37:18 So some of these generating assets that we have throughout the country, you know, they're, they're getting up there in age. Mm-hmm. Well, it, it, it isn't just... 37:26 You don't necessarily have to sh- you know, shut them down and then demolition everything and retire the site. 37:34 Now you have the option of, you know, taking a look at utilizing some of the natural, uh, advantages of, of a facility that's already established, and then convert that to a fusion plant, and that may be a transition- Mm-hmm... 37:51 as these, as some of the fossil plants become older in age, to have a natural conversion over to a fusion plant as the, um, succession, um, which is, um, exciting. So it's gonna take some time. 38:06 It's gonna take some, uh, energy. It's gonna take some commitment through, uh, investors. 38:12 But once it does take off, I think it will be sustain- self-sustaining, and I think it will be the technology of the future, uh, for energy production. Yeah. I love the concreteness of that answer, 'cause I don't... 38:24 I think what there's too much of in the space right now is a lot of hype. There's a lot of private dollars going into it. There's a lot of startups that are chasing- Yeah... 38:31 this kind of, you know, pie in the sky, a- achieve fusion. I love to hear a, a realist kind of take on, here's what needs to happen to get to this future. I, I don't think anybody's in, in... 38:41 is doubting how great of a future it is if we have clean, abundant, sustainable power that, that fusion can supply. 38:49 Um, but I think it's just refreshing to hear that kind of perspective from a utility that is, you know, has a history of providing reliable power to, uh, to this, this region. Mm-hmm. 39:00 Uh, so Tony, it's been an absolute pleasure to sit down and do an interview with you, and thank you again for the tour that you gave us of the facility. This has been a lot of fun, so thank you for the time. Thank you. 39:08 It's been awesome. [upbeat music] Tony started our tour of the facility in the machine shop, where many of Infinity 1 and 2's testing systems will be constructed. 39:19 So one of the, uh, projects we have within our, uh, the Infinity project is to develop, uh, and construct what we call a high heat flux energy beam machine. Mm-hmm. 39:32 This machine will be able to test, on a large scale, material on, uh, its ability to withstand the environment, um, that fusion takes place. 39:43 So the f- plasma fields that we have within the fusion machines, you have to have special material- Mm-hmm... on the equipment that's surrounding that area. 39:53 So we'll be building a, a machine that will test the equipment to ensure it has the right quality before we get into the application of Infinity 1 and Infinity 2. Mm-hmm. 40:04 This machine was, uh, designed by Oak Ridge National Labs. Um, Type One Energy won the, uh, competitive bid to build it here at the Bull Run facility, and it's funded by, uh, Department of Energy. 40:17 But that was just announced a couple days ago. It was just announced in the public, yeah, a couple days ago. Yeah, which is- End of December, yeah. And so the machine that's gonna go in this room is... 40:27 This, this is all part of validating the idea and the research side of building Infinity 1. That's true. Yeah. 40:32 Um, so this machine is going to be not just for Infinity 1 or Infinity 2, this machine will be for the fusion industry- Okay. Wow. That's awesome... 40:41 um, to be able to test large scale ma- uh, materials to see how they will hold up in a plasma-facing environment. 40:50 Um, additionally, um, what we're gonna be building in there is also a smaller scale pellet injection system. Mm-hmm. And that will be able to determine the opera- operation parameters that, for the injection system. 41:04 So when you look at a fusion machine, it uses cold, um, fuel pellets, and it injects them into the plasma flow of deuterium and tritium, and we'll be building a smaller scaled model of that- Mm-hmm... 41:17 to verify the operating parameters are acceptable for the large scale power plant. That's super cool that's happening right here in- Yeah... Clinton, Tennessee. That's correct. Yeah. 41:27 So if you look at some of the large mati- um, equipment that used to be in this machine shop, we're in the process of removing the milling machines, the press, the lathes that used to support the Bull Run- Yeah... 41:39 plant, and then we'd be upscaling the, uh, the lighting, the equ- the electrical, um, the cooling water supply, and, uh, building the, uh, machine right in that area right over there. 41:52 And Sam, if you can capture just a little bit of what we're seeing here as well, and I have a, another question before we move on from it. I, I assume this, this new machinery is gonna be assembled in here- Yeah... 42:04 or is it gonna be shipped complete- No... as a whole? It, the, um, material and parts will be shipped to Bull Run. Mm-hmm. And then, uh, the craftsmen will build the machine- Mm-hmm... um, here inside the machine shop. 42:18 And additionally, the, um, the pellet injection, the fuel injection system- Mm-hmm... same thing. 42:24 The mi- the material to build it will be shipped to Bull Run, and then the craftsmen will build the machine, uh, here inside the machine shop. Okay. Timelines, we're looking, um, to start construction of the, um...... 42:39 fuel injection system around July time period this year. So we're starting to see, uh, a lot of this project moving from the design space to real construction space. So it's right around the corner. 42:54 So, and it's just so interesting to me, 'cause, like, I don't know other regional utilities that are doing something like this across the country. 43:02 Well, I think it's very important that we have the ability to repurpose some of these locations, um, particularly, uh, in the fossil fleet. And, you know, this was, this 43:14 Bull Run was, um, built around 1940, so it is- Wow... you know, some years as the construction took place. I think it went in service, uh, 1963, 1968. So it's been in operation for a lot of years. At the end of life, 43:31 you know, you have the option of walking away from a facility that's been established within the local community with the jobs and the, um, infrastructure, or repurpose it to a new design. 43:46 One thing that fusion energy provides is it allows some of these older fossil plants to be modified to be a fusion plant and keep the grid stabilized. 44:00 So you get the megawatts going on the grid to keep the balancing of the grid. You don't have to run new power lines to the site. They're already there. 44:07 You don't need to run new cooling water lines, um, from, like, the Tennessee River or someplace like that to support the plant. They're already established. Um, saves money. 44:20 It doesn't affect the, uh, local environment, and the local community is benefits from it as well. It's kind of poetic to have a fossil plant, you know, help drive forward something like, uh- Yeah, yeah... like fusion. 44:32 I mean, it's just- That is true. That is true... you know, it contributed to our economy and to, uh, to our power production for so many years, and now it's kind of taking us into that next phase of- That's right... 44:40 energy production. It's really cool. When, when you talk to some of the, uh, older, um, craftsmen that have been working here at Bull Run for, you know, m- their entire lives, they don't wanna see the site go away. Yeah. 44:55 They, they are very excited- Sure... on the transformation to a fusion technology and the, and the wave of the future here at Bull Run. So now in this area w- you will need, uh, safety glasses and a hard hat. 45:09 Tony then led us down onto the turbine floor, where the scale of the facility really hits you. Oh, wow. Okay, it feels so much larger down here [laughs] than when we were up there. Yeah, yeah. So- Wow... 45:21 the distance when you get closer, you start seeing the size- Yeah... of everything that, uh, looks small from up above. Yeah, that's crazy. So this is the old, um, turbine deck for Bull Run facility. 45:33 What you're seeing, uh, here is the modif- the conversion of the old generators into... 45:40 They're being refurbished, and they'll be part of the transmission's voltage control with the, uh, implementation of a synchronous condenser. 45:49 So with the synchronous condenser, I wanna talk about how infrastructure that was already built here is gonna play into how the grid operates right now. 45:58 So can you kind of explain what exactly that means, what a synchronous condenser is, and why that's important? 46:03 So what a synchronous condenser does is it allows the grid to maintain voltage control, um, when there's times of pulling large amounts of electricity in certain regions, like a lot of power going to, uh, the city of Knoxville. 46:21 The voltage will get affected by demand of power. So you have traditionally the generators within, you know, Bull Run with the large s- generator sizes, they're able to affect the voltage on the grid. 46:36 They control the voltage. With the retirement of Bull Run, you take away the voltage control- Yeah... uh, because the generators are no longer in service. So what we're doing here is we're modifying the generators. 46:51 We're separating them from the turbines, and we're retrofitting them to be able to spin and still provide voltage control. They won't provide megawatts, but they'll provide control for the voltage. 47:04 That will help the, uh, transmission organization to control the grid better. That's just a super interesting part of this as well, that normal people like myself would not think about. Yeah. 47:14 How you have to kind of balance the entire voltage control of the grid. And you wouldn't think, "Okay, well, we need to spin these, these generators to do this." It's just such a- That's right... interesting concept. 47:26 That's right. So I wanna... And Sam, I wanna talk about the cranes for a second. Okay. First off, they're massive. How, how much can they lift? D- do you know off the top of your head? 47:35 Like, that's gotta be tons and tons of lift capacity. Yeah. So they can, they can lift the, uh, the generators. Uh, I can get that information. Yeah, no, that's a, that's a- I know... put you on the spot with that one. 47:46 Yeah, I know. The reason I'm asking, though, is with those cranes, I'm wondering does that play into building the f- the fusion machine? Is that a... Is that gonna be required? 47:55 Well, the upgrading of the south crane, uh, it's... They, they don't need to be upgraded. 48:01 The generate- the weight of the generators, uh, here at Bull Run were heavier than the weight of the segments of the stellarator design for Infinity-1. So the, the, the limiting condition is still the generators. 48:18 Um, and we w- the, the, the lifting capability of the, the cranes are, are fine as is, um, to support Infinity-1 construction needs. However, we are doing an upgrade on 'em because we want 'em to be reliable and- Sure... 48:32 be able to handle through that construction phase of the Infinity-1 machine without having any challenge from the crane. Makes sense. We then proceeded down to where the Infinity-1 machine will be assembled. 48:42 Represented by a life-size rendering in the location where the machine will sit So what you're seeing here is, you know, a representation of the size of what the Infinity 1 fusion machine will look like and, and where it's will be sitting, uh, when its construction is completed. 49:00 Um, when you look at the, the, the infrastructure itself, the... it's gonna be built in three segments. 49:08 So one third of the, uh, stellarator, of the circular, um, stellarator will be built, it will be shippable run, we will put it in place, then we'll get the second third and, and then the last third, then we connect the three pieces together for the, um, construction of Infinity 1. 49:27 How do you get that from that raw energy, that heat, how do you turn that into electricity that goes on the grid? How does, how does the science of that part work? Okay. So the science which... 49:36 You know, the science hasn't really changed in many years. Um, you take, uh, isotopes of hydrogen. So you take, uh, uh, deuterium and tritium. Mm-hmm. 49:46 And then you put those two isotopes together close under high temperatures and high pressure, and the nucleuses merge together to form helium, and also gives off high energy neutrons and particles. 50:02 Within the stellarator's design, we have energy blankets, um, lithium blankets that will then absorb that high energy released and convert it in the form of heat. 50:16 We then take the heat off those blankets and put them through a heat exchanger, and that's what then converts the water to steam, and the steam converts to the, uh, to the turbine through the electricity. 50:30 So the design on the, the fusion energy, um, when it, when it comes together to form helium, those high energy particles, that gets absorbed in the thermal blankets. Mm. The thermal blankets convert it to heat. 50:47 There's just something so beautifully simple, that it is all comes back to boiling water to turn turbines. Yeah. Like, it's- That's right... it's just- The conventional plants are- You know... the same. Yeah. 50:57 And the steam goes to the turbine- Yeah... and the turbines go to the generator. We're just finding different, different ways of doing it, more, uh, higher efficiency, complex, beautiful ways of doing it. That's right. 51:08 It's cool. We walked outside to check out where a majority of the work has been done. Yeah, that's a great clearing- Clearing the site for where Infinity 2 and the supporting facilities will be built. 51:18 Now, I don't know whether you wanna look right here. So right where the Brandenburg, uh- Uh-huh... tractor or ba- or machine is right there. Big machine, yeah. 51:26 That is the location of where we're proposing for the Infinity 2 machine to be built. Um, as you can see, we're in the process of, uh, pulling down the boilers and clearing up the, uh, the local area, 51:42 uh, in that, in that location, but that is where the... right now, where we're looking to build the Infinity 2 machine, the power plant. And, and so that's super interesting. 51:54 If all goes to plan, in the spot where water was being boiled by the heat of coal, we're now gonna be building, hopefully, a fusion machine that is... You know, it's just that, that dichotomy- That's right... 52:06 that, that contrast between something we've been doing since the Industrial Revolution to now we have this new thing that we're, that we're bringing and putting in the same spot. That's just- That's correct. 52:15 That's correct. And I guess scale-wise for the construction, and so obviously you're gonna have to build a new shell- Yeah... uh, of a building to be able to be put over there. 52:22 Will it be similarly sized to this facility? Will it be a lot more condensed? Uh, it would be larger. Larger. 52:28 Um, when you look at the, uh, the facility for the boiler, which was tucked to the side of the, uh, turbine building, the stellarator building will be about a little bit larger footprint, and then right next to it, we'll have the conventional plant. 52:42 Okay. But it also has support facilities such as the, um, the tritium processing plant- Okay... and the cryogenics sta- um, plants, which will then need its own building for those auxiliaries as well. Okay. 52:55 So it's to be slightly larger than what you saw as a footprint at the fourth one. As the tour concluded, Tony walked us through the insane conditions these fusion machines will be operating under. 53:06 I mean, the design seems so simple, and, um, I know when we get into the actual parameters or the conditions needed to run the design, that's where it becomes challenging. Yeah. 53:20 And I mean, the plasma flow where fusion takes place, you know, that location, you're, you're, you're operating around, you know, 100 million degrees Celsius. That's... 53:31 And then the magnetic field, the magnetic confinement, which is adding the pressure and keeping the plasma flow pressured and, and concise, that's about, you know, 8 to 10 teslas of, of magnetic force being pushed down to the plasma flow to those atoms. 53:50 The cryogenic, um, plant, which is cooling the magnets, are cooling the magnets to approximately negative 250 degrees Celsius. 54:01 So the simple design has some very, um, challenging parameters to operate. And I guess... All right. I hope you guys enjoyed watching that as much as I enjoyed, uh, doing the tour and sitting down with Tony. 54:16 Just some final thoughts from the whole experience. 54:18 One, it just feels very poetic that a decommissioned coal plant is gonna be used to further fusion research, and hopefully host an actual fusion reactor that's gonna bring power onto the grid. 54:30 Something about that just is so satisfying, and just seems like the way things should be. 54:35 And I think that bodes really well for what some of those other power plants, coal plants could potentially turn into in the future. 54:41 So I really hope that this turns into a model for other utilities and other power providers. 54:46 I think the other thing that I'm really taking away from this interview is just the role that the TVA is playing in partnering with companies like Type One Energy, and how they're leveraging assets like Oak Ridge National Laboratory, University of Tennessee, bringing all these partners in to de-risk it for everyone. 55:04 That is a huge asset and benefit to the entire nuclear fusion research ecosystem. And, uh, they are really diving kinda headfirst into this project. 55:15 They have submitted their permit, uh, with the State of Tennessee, and, uh, they are really just moving full speed ahead with this right now. So overall, I, I just love seeing this sort of stuff down in my backyard. 55:29 You know, I'm born and raised in Kentucky. We're down here about two and a half hours away in Tennessee. 55:34 It just, uh, is really inspiring and exciting to see something as monumental as fusion energy being researched and worked on down here in, in a neighboring state. So would love to hear thoughts from the interview. 55:48 Please drop some comments down below, and we will see you for the next one. Thanks for tuning in. [outro music]