Transcript 0:00 [upbeat music] If you go back to, you know, TVA's creation, innovation has been part of what we do, you know, and always have since day one. 0:10 So we're very interested in helping startups, private companies, public companies, federally funded companies. 0:19 Whatever it's gonna take, we wanna be part of it to help get to the point where new modern advanced reactors are deployable. Welcome back to the Middle Tech podcast. 0:34 You've got Logan Jones here, and today's episode is another dive into the energy sector, again with the Tennessee Valley Authority, but this one is a bit different. 0:44 So not only did I get to interview their outgoing chief nuclear officer, Tim Roush, but I was also granted a private tour of their Sequoyah Nuclear Plant. 0:53 So this episode contains both the interview and some clips from the tour. Uh, but I wanted to warn you before diving in that some of the tour audio is a bit, uh, loud. 1:02 Power plants aren't exactly quiet, uh, and this was recorded from a handheld mic. But I hope it'll give you more of a sense of what it was like to be inside one. 1:11 For this trip, I brought along Alex Mercer from Able Construction, who is a friend and someone who's been exploring the opportunities that nuclear power might open up for the construction industry in our region. 1:21 Our conversation on the drive down set the stage for the day. But before we dive into this episode, I just want to take a moment to highlight the partners that make Middle Tech possible. 1:30 Before we highlight our sponsors, we'd just like to state that the views and content shared on this platform do not necessarily reflect those of our show sponsors. 1:38 That being said, Middle Tech is supported by KY Innovation, the Kentucky Cabinet for Economic Development's Office of Entrepreneurship. 1:46 KY Innovation exists to support and develop Kentucky's startup ecosystem, and we are proud to be supported by an organization whose mission aligns so closely with ours. 1:56 If you are a founder building in Kentucky, you need to check out the resources that KY Innovation has to offer. You can find more information by clicking the link in our show notes or going to kyinnovation.com. 2:08 We'd like to take a quick break to highlight one of the sponsors of the Middle Tech podcast, Awesome Inc, the innovation hub in Central and Southern Kentucky. 2:16 Awesome Inc helps grow the Kentucky tech and entrepreneurial community through pitch competitions, a mentor-driven startup accelerator, the Kentucky Entrepreneur Hall of Fame, co-working, and the Team Alpha Internships. 2:29 Be awesome. Now, back to the show. All right. Don't feel like you have to look at the camera, but just so we're talking. [laughs] Keep your eyes on the road. Yeah. 2:39 All right, you got Logan Jones here with the Middle Tech podcast. I'm joined with, uh, Alex Mercer, who is the head of business development for Able Construction. 2:47 Uh, Alex is joining me for a tour of the TVA Sequoyah Nuclear Plant as we are making our way down to Chattanooga, Tennessee, to, uh, get to see what an actual nuclear plant looks like. 2:59 So Alex, you mind just telling them a little bit about your position and your interest in the space, and, uh, I guess kind of how you and I met and how we know each other? Yeah, for sure. 3:07 Started with Able Construction, what, about six months ago. Known the family for a couple years now, just through my professional career. But, uh, for us at Able, fourth generation family-owned, woman-owned business. 3:20 We're constructing some of the largest automotive, industrial, and healthcare facilities in the state of Kentucky, Tennessee, and Indiana. 3:26 But for me, just given the landscape that we see ourselves in right now, and the, the rapid increase of, uh, power generation demand that, uh, AI and heavy industry 3:39 are looking at over the next five to 10 years, uh, it's just, uh, a, a natural interest of mine to start looking more and more into the power side of things, and how we might be able to best support. 3:49 And so, um, that's where my interest has, has, has really peaked over the past couple of weeks and months in particular. And got to know Logan a couple, uh... it's been a couple months now, actually. 4:00 Um, played a round of golf together, and I've gotten to know him over the, the Middle Tech podcast series, and a couple of oth- of his other, uh, podcasts, um, as well. 4:10 But yeah, just the opportunity to, to share a common interest, uh, in nuclear in particular, but, but power generation more holistically here in the region, and how the, the importance of this region and that space is just gonna propel, uh, industry forward in so many interesting ways. 4:27 And so just the opportunity to come out here to Eastern Tennessee to this facility is just a, a really lucky and, uh, a super interesting opportunity I couldn't pass up. 4:38 Yeah, and I remember when we-- I think the first time we talked about nuclear was at that, uh, golf scramble we played at. 4:43 And then as soon as we started talking about it, I was like, "Oh yeah, this guy, this guy's into the same things." Um, so this interview came about because... 4:51 So if you're a follower of Middle Tech, you saw the interview that I put out with Justin Meyerhofer of the TVA, who is their, uh, SVP of Government Relations. 5:00 Um, and we got to talk about the new SMR that is being built at their Clinch River site. And at the end of that interview, I was just kind of chatting with Justin. 5:09 I was like, "You know, I'm very interested in this space, very curious about it, and if there are any other opportunities to kind of get involved in what's going on right now, uh, I'd, I'd love to do that." 5:18 Um, and he was gracious enough to make a connection to their head of media and communications at the TVA, and, um, one thing led to another. Now I got invited to join a media day down at the Sequoyah Nuclear Plant here. 5:32 Um, so what we're kind of expecting is we're gonna get to sit down for an interview with their chief nuclear officer, Tim Roush. Um, so very much looking forward to that. 5:41 Gonna be kind of talking about his career in the space, and kind of where things are going, uh, now that there's so much momentum behind the space. 5:48 And then we're actually gonna get to do a full tour of the facility as well. 5:51 So we're gonna get to see things like the control room, and the turbines, um, the cooling towers, and probably some things that I'm, I'm not even e-expecting yet. 5:58 So just overall, really excited to see, you know, in person what one of these facilities looks like. So, uh, we'll take you guys along for the ride, and excited to show you what we see. 6:09 [ on-hold music] All right, Tim, thanks so much for making the time to do this. Uh, I wanted to start off the interview. 6:18 So you've had a pretty incredible 30-year career in nuclear, and this is just a very unique time, uh, in nuclear energy in general. 6:26 And, uh, you know, I'd love to just hear your perspective on what it, what it means to have your career kinda coming to an end here with the positive light that is being shed on the entire industry. 6:37 As you kinda step out of this role, what does that mean to you? First of all, I've enjoyed every part of my career. 6:43 Um, and I've kind of always wanted it to get to this point, meaning the industry get to this point where, um, nuclear is sexy again, it's popular, it's important. 6:55 Um, when we think about, you know, the security of our nation, when we think about, uh, data centers, AI, 7:05 uh, the need for new dispatchable base load, clean carbon-free energy, I mean, all that's coming together right now, uh, really driving the interest in nuclear power again. 7:15 So I'm very excited about where we are as an industry and how we are actually ready, you know, to, to meet the demand and the call, uh, at this point. 7:24 Yeah, and I'd love to just dive in a little bit to the things that are driving. 7:27 You mentioned it there with AI and manufacturing being kind of brought back on, and there's a lot of conversation just around national security being kind of, you know, energy security. 7:37 Um, from your perspective, I mean, what does the future look like with, if we kind of draw these things out of having new data centers come online and we're trying to really place an emphasis on bringing manufacturing back? 7:48 I mean, where, where do we get to in another 10 years from here? What is, what is your hope? 7:54 Well, I think, you know, I'll answer it from our current perspective of TVA, but if you think about those companies that are surrounding us in the southeast, right? 8:02 You've got Duke, you've got NextEra, you've got s- you know, Southern Company, and then you've got TVA all kind of tucked down here in the southeast, and we're all kind of anticipating the same growth. 8:13 You know, we're growing somewhere from a residential influx of, of, um, new Tennesseans from between 2 and 3%. That's huge. Mm. 8:24 We have some, some of the fastest growing cities in the, in the country between Nashville and Franklin and Huntsville. 8:31 Um, and then you layer on data centers, and you layer on AI, you know, we're anticipating somewhere in that 10 to 20 gigawatts of demand for just TVA. 8:43 And then if you account for that in the other companies that I mentioned, and they have something similar to that, the build-out of the energy portfolio across just the southeast, to keep it simple, is gonna be incredible. 8:57 And I think that's gonna take a diversity, diverse portfolio, and we have a great diverse portfolio right now in TVA. You know, we're 40% nuclear, about 20% hydro. You know, we have some gas. We have some coal. 9:12 Uh, we have some solar. Um, we're about to go live with a commercial battery. Mm. And I think you take that diverse portfolio, and you just need to kind of replicate that. 9:22 I don't think it's all of one thing or the other, um, for all of the different purposes we're gonna need power for. 9:29 Um, but the demand that will come with data centers and AI is gonna be significant, and that demand is gonna come faster than we're able to produce all the power that everyone would love to have. So there's gonna... 9:43 We're gonna have to find this sweet spot of build-out- Yeah... to meet that demand, whether it's for manufacturing or AI or data centers or whatever the case may be. 9:51 And that's another reason why I think a diverse portfolio is gonna be- Interesting... very helpful- Yeah... 9:56 because we'll be able to build multiple technologies at the same time and not overrun a supply chain that can't produce enough of what we need for just nuclear, right, or just gas or just solar. 10:09 Well, I think that's a key thing when you hear all the above approach to energy generation. I, I feel like you put it very, very succinctly there of you're not overwhelming supply chains. 10:19 When people think about, well, nuclear is, doesn't have as many emissions, and it's more compact than something like solar, like, why not just put all our, you know, all our focus on that? 10:27 But there's so many different, um, variables that kind of go into how we plan out something like a build. 10:33 And, uh, also just from a resiliency standpoint, you know, from a supply chain resiliency just to a pure, the resiliency of the grid, I feel like having a little bit of everything just makes us more resilient and, um, just stronger as a nation. 10:46 Yeah, I, I think there are some, uh, recent situations both nationally and internationally that show you, uh, you know, putting too much emphasis on a digital type of, of power. 10:59 Solar, um, it's, it has to be part of the solution. I love solar power. It has to be part of the solution, but you can't run the entire grid on solar, right? 11:08 It just, right now it doesn't have the inertia that you need to maintain grid stability when there are, are, um- Yeah... minor eruptions. 11:16 Um, you need the var loading, which is a reactive type of power that needs to be out there that makes machines operate and makes the grid more stable. Um, you need dispatchable. 11:27 Uh, one of the things we have is, um, I, I like to call it a water battery, but it's a pump storage facility. So we pump up during the evening to a reservoir, and then we'll let that same water- Mm... 11:38 down during the day, and we'll make 1,600 pa- uh, megawatts of power for 24 hours with just that reservoir load. 11:45 That's dispatchable, meaning we can start and stop that whenever the grid controller wants it on or off, and it's a perfect complement to other sources of power. That's, yeah, that's super cool. 11:56 I love, uh, just kind of innovative solutions to... You wouldn't think that a, a battery can be as simple as just pumping water up to a higher elevation and then- Yeah... letting it come back down through turbines. 12:04 Um, I wanna... You know, you, you are the chief nuclear officer here. Um, and, uh, I wanted to kind of focus a lot on, a lot of the conversation on nuclear as we are here at, at Sequoia. 12:14 Um, I'm curious from, from your perspective, we just had this... whole kind of presentation talking about, uh, when the, when the reactors were built back in the, um, came online commercially in the 1980s. 12:25 Um, they had their licenses renewed, um, back in, I think, 2015 is what it- what they said, and now it's through 2040. 12:31 You guys are spending a lot of money making sure that you're optimizing things, that, that things are, are staying safe and effective. 12:37 Just talk about, um, how you guys think about life extension of existing reactors versus building new ones, because you're, you're kind of exploring both. Yeah. 12:45 So talk about that kind of thought process as an organization. Yeah, I think what you heard from Matt earlier today, uh, in the briefing, um, was, you know, optimize the existing fleet. Mm. 12:55 So we have seven reactors, right? 8,300 megawatts of carbon-free power. Um, extend them, and then explore new nuclear. So let's go through that. So, um, there's... 13:07 We built a plan, we call it the NLE or the Nuclear Life Extension Plan. It's a 15-year plan. 13:14 It's approximately $1 billion per unit, so $7 billion across our seven units, and it's designed to upgrade, change out, or re-engineer large assets like our turbines, uh, large motors, large pumps, uh, those kind of assets that have been running for 40, 50 years, and replace them so they can run 40 or 50 more years, um, number one. 13:43 So that's the extension piece of it. But also, with advanced m- engineering and advanced manufacturing, we can get more power out of these exact same units. So we built this 15-year plan, 13:55 um, assets for all s- seven units, that we will change out over the next 15 years, uh, and reinvest in these plants. Uh, and that'll allow them to operate out to 80 years plus. 14:09 So if you're sitting right here with 50 years in and we're gonna extend out to 80, and you're gonna spend $1 billion on an as- on two, on... Or $1 billion on each of the two assets. 14:20 So for $2 billion, you can get 2,400 megawatts for 30 more years, that's a no-brainer. Yeah. Right? I mean, that's just... It's absolutely part of the three contributions. 14:31 You know, optimize, extend, and then, uh, explore new nuclear. 14:35 So it's definitely a good thing for us to do to extend the life of these existing units, but you have to make the proper investments so that they run safely, reliably, resiliently, and at a low cost- Mm... 14:48 uh, to the consumers. How do you guys think of some of these new entrants to the space? 14:52 Um, you're seeing a lot of private funding flowing into things like SMRs and kind of advanced reactor designs, and I know that still has to go through NRC approval. 15:03 Um, but how do you guys as a, as the TVA think of, of working with, um, people like startups and new technology that's kind of coming onto the scene? Yeah. 15:12 I think if you go back to, you know, TVA's creation, innovation has been part of what we do, you know- Yeah... and always have since day one. 15:20 So we're very interested in helping, um, startups, um, private companies, public companies, federally funded companies. 15:31 Whatever it's gonna take, we wanna be part of it to help get to the point where new modern advanced reactors are deployable. Um, so we have our Clinch River site. It has an early site permit for SMRs. 15:47 Uh, we're currently produ- uh, pursuing the BWRX-300 for that site. Mm. At least one unit of the BWRX-300. We also have an MOU, and just recently signed a PPA with Kairos Energy. Yep. 16:00 Uh, so they're gonna build our Hermes, which is a Gen 4 non-light water reactor. You know, a, a molten salt type of, uh, coolant. Mm-hmm. Completely different technology. 16:10 A whole lot- new, new level of safety features built into it. Um, and it can be used for more than just generating, uh, electricity. 16:19 It's, it runs at a higher temperature, so you can use it, uh, its, its heat source for chemical production and some things that we can't do with the current, uh, generation reactors. 16:30 It also is built to fluctuate with demand. So as the sun comes up and solar starts to pick up, that unit can float down. Hmm. Right? 16:40 So you can maintain that balance that you need on the grid very easily, uh, very efficiently, uh, with some of these new technologies. So we're very interested. 16:51 Um, we're one of the pioneer leaders in the United States on being ready for it. Our issue is really funding. Uh, because we're a public power company, um, we can't push all that. 17:03 Um, we don't have shareholders, and we can't push first of kind or, uh, you know, the first four that are first of kind onto the ratepayers. It just wouldn't be fair to them. 17:15 So we're trying to find a solution where we can build one or more of these and have some offset, either through partnerships or some federal funding, so then that we're not putting any more on the ratepayers than it would be if we built a gas unit of the equivalent size. 17:31 Mm. Right? Um, so that's really our, our, um, kind of our bottleneck right now. But- Yeah... we really need, um, the designers to finish their work so that they are buildable and affordable. Yep. 17:45 There are many designers out there that are, you know, saying they've got it, but we need to see that come to fruition. We need policy that enables the construction to actually happen- Hmm... in a timely fashion. 17:59 These things take more than one administration. Yeah. So you can't be halfway in, and then another administration comes in and completely undoes what you invested in, which is gonna take 8 or 10 years to finish. 18:11 So we need to get some policy that gives us a sense of confidence in that, um, and enables that new technology be- to be put to work. And then we need, you know, we need funding. 18:23 All of us in this industry need some support for those first-of-kinds to, to kind of break the glass, get one into production, prove that it can be done. 18:32 Because the real, um, gem of the new technology is you can build it modular- Yeah... 18:39 and truck it here or barge it here or train it here, and then put it together like a set of Legos, and that's where we ought to be able to control cost, quality, and efficiency in that construction. Yeah. 18:51 And for those listening, um, that would like to understand more about the technology, you might be familiar with him. We had Dr. Nick Turan, uh, on the podcast not too long ago. 18:58 Um, he was one of the early engineers, um- Mm-hmm... at, uh, Bill Gates', um, advanced reactor company. I'm, I'm blanking on the name of it. Uh, it is up in Idaho. You remember the name? TerraPower. TerraPower. 19:10 Thank you. Um, anyway, the, he discussed a lot of that, uh, advanced reactor design that you're talking about. 19:16 Um, I'm also very excited that, you know, y- this is y'all's backyard and we're seeing all this investment kind of start happening where you guys are, are playing and have all of your assets kind of, uh, here in Tennessee and in the Kentucky-Tennessee Valley. 19:28 And I'm, I'm from Kentucky and, as well, and pay a lot of attention to this. Uh, why do you think that some of these companies are s- what... why are they starting to invest in your backyard? 19:38 And what do you think that they're... What light do they see the TVA in when they're making these sorts of investments? So thinking of things like the Kairos, um, power purchase agreement that you guys just signed. 19:48 Well, I think there's a couple reasons. Um, one, Tennessee and the Tennessee Valley's a, a great area to do business in. Mm. Um, you know, we're, we're... it's all about partnerships. 20:01 We ha- one of o- we, we talk about three E's for TVA. It, it's energy, the environment, and economic development. 20:08 And we do economic development extremely well, and we support companies to come in, build and operate in this, in this state, um, in a way that they feel like they are a true partner with us. 20:22 Our prices, uh, are, for residentials are in the lowest 25%, so we're top quartile pricing, and for industrials we're top decile. 20:32 So if one of your main cost of operating a, a manufacturing plant or something else in this area is your, is your cost of electricity, you're gonna get some, some really good pricing here. 20:44 Um, our governor has made the Oak Ridge area kind of a technology corridor for new nuclear. 20:51 He, he wants, and, um, many of our representative, um, stakeholders want it to become a hub, uh, you know, for new advanced n- uh, nuclear technologies of all sorts right here in the Oak Ridge area, you know. Mm. 21:07 Um, I mean, we had a major project many, many years ago, World War II kind of project, that, uh, created so many spinoff companies and jobs and, and, uh, development that we see this kind of as a peacetime opportunity to do that- Yeah... 21:24 um, and recreate that hub. Um, you know, the University of Tennessee is right there. You've got Oak Ridge right there. You've got companies coming in that wanna manufacture fuel. 21:34 You've got fusion companies that wanna come in and, and, you know, prove concept. Uh, you've got TVA right here. We know how to build these things. We know how to staff these things. We know how to operate these things. 21:48 Um, we have a proven track record with mega projects. Mm. Um, so I just think all those things combined make this a pretty fertile area- For sure... 21:57 for, for companies to come in and consider, um, setting up shop or setting up their first-of-kind in this area. You just mentioned it there, um, nuclear fusion. 22:06 So just to clarify the difference between the two, fission is splitting the atom, producing heat from that reaction, creating steam, turning a turbine. 22:15 Uh, fusion is something completely different, something that we have not been able to, um, commercially harness in a way to, to generate energy. 22:22 As somebody who's been in the space for a long time and obviously is incredibly knowledgeable on all these sorts of things, how do you view a technology like fusion? 22:29 Is this something where, you know, is, is it another decade away? Is it closer than that? I mean, everyone's been saying, "Oh, it's a decade away," for 30, 40, 50 years. Yeah. 22:39 Um, I'm curious, somebody in your position with your experience and kind of your understanding of the ecosystem, how do you view a technology like fusion? 22:45 Does it come and just completely displace all of the infrastructure we built with fission, or is it something similar to where it's, we still want a, you know, diversity from our, our generation sources? 22:56 Yeah, I think, um, I think it will be a game changer someday. Um, I think it will happen. Uh, when I was in college for my undergrad, it was 10 years away. Yeah. 23:07 [laughs] That, that was a long time ago, and it's, I think it's still 10 years away. 23:10 I think we're closer than ever, but we're closer than ever to proving that it can be a fusion chain reaction, it can be harnessed, it can be controlled. Mm. But then there is making it commercial- Yeah... right? 23:23 To make electricity. That's a whole nother part of this. Um, so I, you know, if I had to, to put my chips somewhere, I'd say it's 10 years away, again, for commercial. 23:35 I don't think it's 10 years away from proving concept. Um, I think it will be an integral part of the new portfolio. 23:43 You know, I think you lay in fusion, it, it would, it would have a different role, um, and displace some other current, uh, portfolio components. I don't think it will be overtake everything. Right. 23:56 We won't be able to build it that fast, um, or in, in all the areas you need it. So I think you're still gonna need small module reactors. You're still gonna need gas peaking plants. Mm. 24:07 You're still gonna need base load, carbon-free nuclear power. You're still gonna need pump storage and batteries. 24:14 And so I, I think it changes the portfolio outlook a little bit, but it doesn't eliminate the rest of the portfolio. Sure. 24:20 And where do you feel like just, this is not just specific to fusion, but where do you feel like the bottlenecks are for this type of buildout that we wanna do? Is it, is it the technology? Is it the policy? 24:30 Is it the workforce? I'm sure it's a combination of all of those, but- [clears throat]... like, where, where would you focus right now? Which, which part of that bottleneck? Yeah. 24:37 I think I'd go back to, we were talking about a couple minutes ago, I, I think- Of the three choices that you just gave me, 24:43 we need the technology to be brought over the finish line, meaning they are finished, approved- Sure... designs to go construct. Mm-hmm. We're not there yet. 24:51 There's a lot of people that are close, but we don't have any of those. Um, we need policy that will enable large-scale build-out. Um, 25:02 it's very difficult right now to license a power plant and to, uh, construct that power plant and get all the regulatory, whether it's environmental, you know, it's Department of Energy, it's Nuclear Regulatory Commission, it's state, it's local. 25:21 It's very time-consuming to do all of that. When we built these units that we're sitting at today, they were 10, 11 y- years. Mm-hmm. 25:29 I think you're- we're still probably in 10, 11 years from the time you pick a site to the time it's commercial. Mm. Even with the advanced design. So, um, 25:40 many of those designers are saying, "Oh, no, we can cut that in half." But until we do it once or twice, I don't have a whole lot of confidence that we can do it repetitively in five or six years. 25:50 We need to get through that process. So I think 25:54 the design and technology has to be driven across the finish line, and then we really need to see policy reform that streamlines the whole process to environmentally site and to license, um, uh, the construction of these units. 26:09 Mm. And keep them safe. There's no doubt we cannot, uh, reduce the level of safety that we build into them. Um, but the newer ones are taking safe and making it even safer. Mm. 26:20 So, you know, I'm excited to get to the point where we're operating some of those newer ones. Uh, so, so I think those are the two drawbacks. In our area, in the Tennessee Valley, we have a tremendous workforce. 26:34 I'm hearing other parts of the country, my peers that are chief nuclear officers in other countries all around the country, um, 26:41 the pipeline from colleges and the pipeline from the professional trades is not as, uh, proficient or available as it is here. We are seeing, um, a pickup in terms of folks entering the trades. We are seeing... 26:57 I, I'm on the University of Tennessee's, uh, engineering, nuclear engineering advisory board. They're gonna have over 500... Or they started back to school. 27:05 They're gonna have over 500 students studying nuclear engineer at the University of Tennessee Knoxville this year total. Mm. That is huge compared to where we were 5, 10 years ago. So this area is responding very well, 27:19 um, to this industry and this technology and these new technologies. 27:24 I know workforce can be a little bit tougher elsewhere, but right here, uh, we're- I see us being in pretty good shape with the trades and, and the professional, uh, college degrees. Yeah, 27:37 I, I, I think that it would be... With all this momentum that we have going on, I really just wanna see us get building because I think that if we can start building, then we can start learning- Yeah... 27:46 as we build, and we can just improve and improve. And, and do- going the fleet scale route really does seem to be, um, the right, the right move from, from where I'm sitting. 27:55 Um, would love to focus specifically on, on Sequoyah here for a little bit. 27:59 Um, so, you know, I know when people hear the word nuclear, people start thinking of all, all sorts of safety things and disasters that have happened in the past and things like that. 28:08 Um, but in reality, nuclear is actually a very, very safe form of power generation. 28:13 So can you just talk us through from a safety perspective, the different precautions that are in place here, and just how you guys are ensuring that this plant continues to run reliably and safely, and just kind of for people that don't understand, you know, everything that, how much attention is really put on that particular subject? 28:30 Yeah. When I, when I talk about nuclear safety, there's really three main parts of it. There's people, plant, and process. 28:37 So the first thing is our people that operate or maintain these facilities are very highly trained. Mm. You heard a little bit of that earlier. 28:47 Um, I can graduate with a nuclear engineering degree, and I went through a licensed class. There's no shortcut. It's still two years of intense training in the classroom and in the simulator. 28:59 And then ultimately, if you're licensed by the federal, uh, the Nuclear Regulatory Commission, that license has your name on it. It doesn't have TVA's name on it. It doesn't have Sequoyah's name on it. 29:08 It has your personal name on it. You are responsible for operating this power plant safely and reliably. So that's a, a, a pretty high accountability- [laughs] That's a huge responsibility... 29:19 to have the license with your name on it, so you know when you enter that control room, right, "The, I- this is my watch and, and I'm gonna make sure it goes extremely safely." 29:31 So, um, our instrument technicians, three years of training. Our chemistry technicians, you know, one-plus year of training. 29:38 So folks are very highly trained, and then they go back every five or six weeks for an entire week of refresh training to sharpen those skills, to drill on what if scenarios, to use mock-ups and simulators and flow loops and all the technology and tools we have to make sure when you go back in the control room, you're bringing your A-game. 30:02 That, that's the only game that's acceptable is your A-game. So that's the people part. The pro- the, the plant part of it is the reactor. You know, you have the fuel pellets that we showed you earlier. 30:15 That cladding creates a barrier for any fission fragments so it doesn't get outside of those fuel pins. Mm-hmm. Then you have the reactor vessel. Then you have the containment. 30:25 And then, you know, so you have multiple layers to protect, keep the fission products in. And then in the event something were to happen to any of those, you have emergency systems that have redundancy. Two trains. 30:39 You have two trains of electrical power. 30:42 Most of our logic system are two out of three, meaning I'm gonna get- if I get two signals out of the three, that's gonna actuate an automatic feature to shut something down or start something up. Um, 30:54 so the, the systems are built with significant redundancy. We don't need any outside power. 31:03 We have our own generators on site that control all, that can power all of our safety systems without any of the grid being available. We never wanna see that happen, but we're designed for it, and we're ready for it. 31:17 And then when you get past, um, Fukushima, if you wanna talk, you know, when you said a couple accidents in the past, what we've invested again on what we call design- beyond design basis situations. 31:33 You know, the, the river is estimated to crest at some max level. But what if it went one and a half times that? Mm. What would that do to our plant? How would we be ready for that? 31:46 And so we built additional equipment in after we were commercial. We've got flex buil- we have a flex building, and it's full of machinery that can move debris out of the way. It's got additional, um, diesel generators. 32:01 It's got, we got fuel tanks in there. 32:04 We, you know, we've got everything we would need for a natural disaster if it were to be in this area to move that disaster out of the way and restore, um, you know, all of the normal operations of the plant. 32:16 So each of the units around the country added that kind of feature post-Fukushima, well beyond. Now, 32:24 when you look at something like Fukushima, there were design issues associated with, with that plant that we don't have. You know, they were on the ocean. Mm-hmm. 32:34 There was a tidal wave or, um, a tsunami wave height that, um, over the course of many years was recalculated to say it's gonna be higher than we previously thought, higher than we previously thought. 32:47 Well, we're not sitting on an ocean here. Mm-hmm. Um, but we do evaluate, well, the river may flood to here, but what if it was worse? So what that's... 32:55 We try to take the lessons learned, and instead of saying, "Can't happen here 'cause we're not on the ocean," we say, "Well, what's the equivalent of that?" Yeah. 33:03 And we drill ourselves to that, we test ourselves to that, we design for that. And then lastly, process. The, everything we do here is by procedure. Mm. 33:14 Um, and in fact, if, when you go on a tour, if they're manipulating anything in the control room, you'll see one control room operator reading the step, another one repeating it back- Mm... 33:26 and the first re- um, c- control room operator saying, "That's correct," provided it was repeated back correctly before they take the actual action. 33:34 You'll see them point at a switch or a button and say, you know, "In accordance with this procedure, I'm going to push this button to start this piece of equipment." 33:43 The second operator is gonna verify that that person's finger is in front of the right button with the right nameplate that matches the procedure exactly. 33:54 So it's the combination of people, plant, and process that makes us extremely safe, extremely safe, um, relative to any other industry that I know of. Yeah. 34:07 It's very apparent when you come in, just the, the feel of coming through the security, everyone, everyone's honestly being very helpful, and you can tell that everyone's very knowledgeable on the process that needs to be followed and all that. 34:20 It's just very apparent as you kind of walk in and, um, are amongst all of your, all of your people here. 34:25 Um, as we wrap things up, I really wanna kind of focus on, you know, the kind of the next generation that's gonna be coming in. You know, you're retiring. 34:33 Um, I believe it's Matt is kind of, is coming in to replace you as chief nuclear officer. 34:37 Um, for the next generation that maybe they're, you know, coming into college right now, they're, they're curious what a career could look like in, in nuclear, what would you tell people about the kind of the future career, career prospects for what they could be doing in nuclear? 34:53 If you were 25 or if you were 20 years old, where would you be looking to get involved in nuclear at this moment? 34:58 Well, I think, um, kind of as we started this whole conversation, um, we're looking at a real boom in this, in this business. 35:07 And whether you are on the construction side of it, you know, you- you're a welder, a f- a pipe fitter, an electrician, a mechanic, you're gonna have the whole construction build-out, uh, in this industry, which is one part of it. 35:22 Uh, the other is, hey, you wanna operate one that gets built or is built or maintain, be a maintenance person, a, a technician, and one that's built. 35:31 Uh, the demographics are such that we are busy replacing some of the folks that started 20, 30 years ago, like myself. Um, I, the way I would say it i- in summary is 35:45 companies that own nuclear are in it because they wanna be in nuclear, and they understand the accountability that comes with it. So they're very good companies. Mm. Um, you're among nuclear professionals. 36:02 Everybody that is on this site is a nuclear professional. They all have a different role and responsibility, but they are a nuclear professional. 36:09 They are here to protect the public, protect themselves, their coworkers, and the environment, and they're not gonna let that accountability, you know, wane at all. 36:19 So, and then you don't build an asset like this if you don't intend to run it 40, 60, 80 years. So it's a pretty great combination when you think about it. 36:29 You got a company that, uh, is investing in a technology that they intend to be here for a long time. 36:37 They've, they've gotta have high moral, ethical, uh, values and culture to be a, a nuclear operator or operating company. 36:47 And you're among, you're among some of, you know, any industry's best with all these nuclear professionals. So it's a great place to work. It's a great career. And for example, I started as a, um, a nuclear instructor. 37:02 So I went through all the program- programmatic requirements that teach the guys in the control room how to run the plant. That was my first job. Hmm. 37:11 But I went from there, I went into maintenance, and then from there I went into ops, and from there I went back to engineering, and from there I went into project management. 37:19 From there I went into outage management, and then I was a, you know, I was a plant manager and a site VP, and eventually a CNO. So it's, it's not this ladder of, of hierarchy. It's more of a lattice. 37:32 You- once you're in, you can kind of move around the cabin freely- Hmm... uh, and get all these different experiences 37:39 and really take what you have to offer into different parts of the company a- and provide some value, you know, that... 37:48 And you get a tremendous amount of fe- you know, val- you feel valued doing it because it, they're just... It, it's a good career with great people, and by the way, it pays well. 38:00 Um, th- these are, these are high-paying professional jobs, and they're, they're sought after, uh, by most people in the Valley. 38:08 They'd love to work for this company, and specifically the nuclear part of the company 'cause they're paid well because of all the requirements that come with showing up to work every day. I love that. 38:18 And I think f- from my perspective, one of the reasons I'm so fascinated by nuclear and energy in general is, you know, it's the origin of everything. Everything is downstream of energy. And if- Yeah... 38:28 I feel like if you really want to have a direct hand in furthering human flourishing, being involved in energy is, you know, I think the most direct way you can do that. 38:38 And being involved specifically in nuclear, I feel like is the most exciting place you can kinda be doing that right now. 38:42 So, um, just super honored to be down here and, and honored you take the time to talk to us, and very excited to go on a tour and, uh, see the, see more of the facility. 38:50 So Tim, thank you so much for taking the time to talk. It's been my pleasure. Thanks for having me. 38:54 [gentle music] [machines roaring] Our tour guide, Sequoyah's fire marshal, Jake Carroll, navigated us through the facility. 39:04 Our tour started off in the area where steam generated from the reactor moves throughout the pipes to and from the turbines above us to generate power. 39:12 The heat hits you like a wall when you first walk in, and then you realize you're feeling the heat from the splitting of atoms. That's hot. 39:21 During the heat of July when we were having the 100 out or 100 degree days, we'd peg out at 120, 122 degrees right here. Holy moly. 39:32 You realize that we have workers that are building scaffold, and as they're building scaffold up, the temperature, of course, is much- Yeah... higher as you go up in elevation even within here. 39:44 Uh, one of the workers said, "I came down to cool off." I swear. Walking through the turbine building, Jake explained how enormous amounts of steam and water move throughout the facility every second. 39:57 More than 1.6 million gallons per minute circulate to keep the system balanced. What struck me was the separation. The water that cools the reactor core is in a completely closed loop, never mixing with the river. 40:11 The river water's only job is to condense steam back into water before it's safely returned downstream. That design ensures zero radioactivity ever makes its way into the environment. 40:23 So we have heaters that help to reheat the steam, so that way we get maximum efficiency. When does it get reheated or why? It's come through the turbine- Okay... 40:37 and now we're reheating it to- So it's- Put it back through the turbine. Right. I just thought it's cool. Yeah. You got like all these heaters sitting out here. I mean, it's a- Yeah... dead of summer. 40:47 So- You just walked by an air conditioner. You notice that? That's the air conditioner? That is an air conditioner. [laughs] There's another air conditioner. They need to be doing a, a little more. 40:58 I'm not, I'm not noticing the effect. [machines roaring] Crazy hot. This whole section is a condenser. 41:13 So above the, the turbine is sitting right above you. Yeah. Okay. So we talked about the high pressure, low pressure, low pressure, low pressure turbine, right? And it's rejecting the steam. 41:26 So once the steam hits the blade, it's rejected down. This is a condenser that captures that steam, and then it goes through that tertiary loop of water to pull that off. 41:37 That's some of the pumps you see on the lowest elevations out here. And none of this water is from the reactor. Right. This is just what's g- what's boiling and becoming steam. We don't have boiling water. Good. 41:53 It's all under pressure. Remember, the pressure is 2235- Super hot. Okay... 2237 pressure, and so it's under pressure. Just like a pressure cooker on the stove- Yeah... that you have in the house. 42:05 You take your vegetables from the garden, you put them in a pressure cooker to seal it. Well, you don't boil away your water when the water's under pressure. 42:13 So does that mean it goes straight from liquid to a gas whenever you take it off, take the pressure off the cooker? Yes. And it will vaporize, but we keep it right there at that sweet margin. 42:26 That's why the pre- the, the temperature, you noticed, was like 647. Yeah. They work to keep it like right there. Yeah, yeah, yeah. Very cool. That's, that's that sweet spot. 42:37 As we made our way through the plant, my mind kept trying to comprehend how such a structure could even be built, and how some of the massive pieces of equipment I was seeing could be transported. 42:46 After seeing train tracks running through the facility, I asked Jake what they were used for, which he explained played an integral role in constructing the facility 42:55 Can you kind of tell me the significance of the train tracks and how it helped build the whole facility? So as Sequoyah was being built, it was brought in on trains and tra- uh, train cars. 43:07 And there's actually a small switch yard out at the front. And if you look down Sequoyah Access Road, there is a train track that runs all the way down the side of the road. 43:18 And then it gets up here to a s- kind of a switch, and so you can tell the cars to go different places. But this track right here brought in the materials, uh, to, uh, build the rest of the plant. 43:31 So the pumps, the turbine, all sorts of other components were brought in here. We, uh, can also use it to bring in, like on tractor trailers now, or even, uh, there's a go-hopper that is pretty wild to see. 43:45 It's got like 82 wheels on it. And, uh, the, uh, turbine will sit on it. They'll bring it in here, use the overhead crane, and lift it up to the turbine deck. And then that'll be... 43:58 They'll be able to transport it other places in the facility with that crane? Right. Yeah. Very cool. We were then led up to the turbine room, which was easily one of the loudest parts of the plant. 44:07 Here the heat from nuclear fission becomes mechanical energy. 44:12 High pressure steam spins turbines at 1,800 revolutions per minute, converting atomic energy into electricity that flows across the Tennessee Valley, capable of powering almost 1.3 million homes each day. All right, so 44:29 we make the steam, okay? The aux building makes the steam, pumps it through the pipes. We've got that going on. The pipes bring it up to here, as it comes up to here it goes in through... It starts hitting the turbine. 44:44 So you see the steam coming together, and these are the throttle valves. Right. CTV, throttle valve comes on, governor valve. 44:52 So there's a hydraulic control that's controlling the amount of steam that is coming in, the amount of force versus how much it's taking to actually keep the rotor turbine generating at 1800 RPM. 45:07 And all that's measured hydraulically. And it's making very minor adjustments that it's hard to see with the naked eye. Yeah. All of this was invented in the 1980s... '70s and '80s? 45:18 Like a lot of this equipment was '60s, '70s? Conceived back then. 'Cause we aren't the first nuke plant. Right. So we- Right... had somebody else's design. Yeah, yeah, yeah. But yes. And this is Westinghouse equipment? 45:31 This is Westinghouse. We're a Westinghouse four loop, uh, pressurized water reactor site. So you're standing in the turbine building. And if you remember when you came in, Matt pointed out the reactor building. Yeah. 45:44 It was the concrete shield building, right? That's standing behind us. Yeah. So this wall right here that you see is called the control building wall. That's also where the main control room is located. 45:58 Behind that is the aux building. You heard us reference that, the auxiliary building. That's really the radiologically controlled area, the RCA. 46:08 So inside of the RCA is the way that we access the reactor buildings for unit one and unit two inside. And so do you need to have on like protective gear to go inside the actual reactor building? Or is... 46:23 Because it's submerged, does it block a lot of the radiation? That is a very wonderful, great- [laughs]... highly detailed question. [laughs] Okay. 46:33 So the quick e- the answer is every single day we go in dressed just like you and I are right now. I go into the reactor building, the radiologically controlled area, the RCA, every day wearing what we have on right now. 46:48 Now if you're wearing synthetics, it takes a little longer to get back out because some of the gas will just kinda stick to that. It takes it to evaporate off. But by and large, you just come and go, huh, no big deal. 47:03 Then we have what we call C zones, contaminated zones, and this is where you may have some contamination in the area. It is not like massive. It is- Yeah... it is very minor. 47:17 Uh, you probably have more in your home than we do even here in some of those areas. 47:24 Once you get past that, and you go inside the reactor building and inside the polar crane wall, that's where you have to have on the PCs, which is the, like a white Tyvek suit. You see the rad worker out- Yeah. Okay. 47:40 That protective clothing is not needed until you are inside of a C zone, a contaminated zone, and that protects you. So no, you don't have to wear any special thing to go inside the RCA. It is all cleaned. It is healthy. 47:56 I don't pick up hardly any dose at all, and I'm in there all the time. I don't pick up anything. The only time you pick up dose is when you go inside of a C zone or if you go inside where the reactor is. 48:09 But even at that, it's not outrageous. It is well below the occupational limit. Well below. Outside we stopped beneath Sequoyah's iconic cooling towers. These towers don't really smoke or anything toxic for that matter. 48:25 They only release water vapor, essentially clouds. Their job is to make sure the river doesn't heat up too much when they discharge water back to the river. 48:35 In the wintertime we only adjust the tempera- We can only adjust the temperature by nine degrees. In the summertime we can only impact it by three degrees. It is monitored multiple stations upstream and downstream. 48:49 So we are in constant communication. If it's... If river op says, "Hey, you're gonna raise the temperature up because of the temperature of the water," and, and if you remember Matt and Tim said we don't impact... 49:02 We do not negatively impact our environment. We respect our environment. So to do that, we monitor our water temperature that we're discharging back into the river system, right? 49:14 Well, to make sure our water is equitable temperature- Then we use the cooling towers. 49:20 At this point in time we're open mode, we just took them offline because the river temp decreased because we don't have all of that extra heat that we had two weeks ago, right? Now at the bottom is where... 49:34 or if you look at the bottom you see the skirt. Well, right above that is where we dump the hot water on top of that, then it falls down. 49:42 Air is then drafted in through the outside, hits the center of the cone and goes out the top. Mm. 49:48 So it's that parabolic design, that iconic parabolic design that pulls in the air and as the water is dropped down right through here it breaks it into smaller particles. 50:00 The air cools it, turns it into steam, and we make our own clouds. I feel like that's something the, the general person just doesn't know about. Like, that's brand new information for me. Um- Super interesting. 50:13 I, I have been at Bear Trace, uh, Golf Course which is right across Tennessee River with some friends before and they said, "Oh look, the power plant's working," and there was steam coming out of the, the cooling towers. 50:24 No, no, no, no. [laughs] All that is is cooling towers. All it is is steam. Yeah. And it is like Matt, uh, said earlier, it is... all that it is is the Tennessee River being returned to the Tennessee River. 50:40 And I guess just to reemphasize, whenever the water's being returned, that's not water that's been in the, in the reactor. That's correct. That's just water that's been used to turn the turbines- That's correct... 50:49 cooled back down. And we mo- we have radiation monitors 50:53 all through every water that goes out of this plant is checked, double checked, triple checked, upstream, downstream and on site before it's ever released and it goes through, uh, there's a couple of different, uh, barriers before it ever is allowed to go to the waters of the US. 51:09 We protect the waters of the US so tightly that if we have, like, a half a gallon of anything on this site, then it is bad. Yeah. So it is very well monitored. That's awesome. 51:21 Our final stop on the tour was to the control room where we met senior reactor operator, Andrew Gifford. 51:27 He walked us through how just about every component of the reactor is controlled and all the safety features and redundancies that are built into the plant. All right. 51:34 I'm a senior reactor operator, or as we call here at Sequoyah the title is nuclear senior unit operator or NUSU. Uh, 51:44 my function is to provide oversight for the reactor operators which we have Justin Beyer who is the control room operator. 51:52 He's over the secondary side of the plant, the electrical plant, the secondary pumps, the non-nuclear side of the plant. And then Philip Chandler is the OAC or the operator of controls. 52:02 He's over the nuclear side of the plant. Walk me through what all this stuff does here. So if you l- look up you'll see signs or placards up over the board. Like this is generator and auxiliary power. 52:16 So we're starting here at mic one and the panels are numbered. Unit one, mic one, all the way to mic six and other auxiliary panels. But we start out, these are the actual generator controls. The, uh, 52:33 switch here with the two red lights next to it- Mm-hmm... that's the actual generator circuit breaker. That's what we close to tie this generator onto the grid- Oh, wow... to put our power out. 52:42 So that's literally the button that you hit to- That is, that is the hand switch... give power to the people. [clears throat] That's it. Mm-hmm. Wow. As you come on down through the rest of mic one, this is where 52:52 we get power coming from the grid to power the plant so we can make power. Okay, so- I know that sounds redundant but- That... No, that makes... I was... That was actually a question. 53:01 So you guys are getting power from the grid rather than taking power produced here and powering your own operations with it? It, we... It's kind of a mix between the two. Okay. 53:10 We have two transformers that are fed directly by our generator. Mm-hmm. But we can't stay... We can't have our generator running and only have those two transformers energized to power the plant. Mm-hmm. 53:25 It's not stable. We have to have enough load from the grid to maintain our generator stable. Gotcha. But the way we're... 53:32 Everything's lined up and powered right now, the plant is actually running off of the unit station service transformers which are powered from our generator. Now we have two, at least two at all times, 53:46 available qualified offsite power circuits coming in that if for whatever reason our generator trips 53:53 or we have to take the unit offline for whatever reason, shut down, outage, maintenance, then we realign our power system 54:01 so that we're feeding off of those, and it will transfer automatically to the alternate supply as well, depending on the, the situation that happens. How long have you been doing this? I hired in at TVA in 2012. 54:15 I worked for Westinghouse years ago- Okay. Yep... repairing various components- Oh, so you-... in nuclear plants. I didn't put t- put it all together what it all did- Sure... until I came here and became an operator. 54:25 But- Huh... 13 years this September. What's your, what's your favorite part of your job here? I, I just love working here. It's, uh... I feel like I've been turned loose in the machine- Yeah... kinda, huh? Yeah. 54:37 No, this is super interesting. So what about, what about the actual reactor, like the control rods and all that? So we come on this way and this is, this is how we control our turbine. We... 54:47 The numbers in the reference and setter, that's a representation of how far the valves that admit steam to the turbine are open. Okay. Yep. And that directly affects how much power we put out on the grid. 54:58 Remember the governor valves and throttle valves I showed you earlier? Mm-hmm. Yeah. Yeah. That's what controls those. Okay. Nice. And then this is all condensate and feed water heaters. So as... 55:10 Throughout the process we'll extract steam off at various stages in the turbine and use that steam to heat, pre-heat the water that's going back into the reactor. 55:20 So we don't have to heat it up as much with the nuclear reaction. More energy efficient? It, yeah. Yeah. The, this is one of the more efficient plants in the country, probably the world. 55:29 Somewhere around 33, 34% of the heat that the reactor produces actually gets converted to- Hmm... electricity and goes on the grid. Very cool. 55:37 And these are all the condensate and feed water pumps which pump it all, the water, into these level gauges here for our steam generators, which we have four of them. Mm-hmm. 55:49 [clears throat] And so I see one thing here, one thing I want to ask you about. Okay. I see a lot of this looks like it was probably installed in the 1970s, 1980s, and then I'm seeing some digital stuff here as well. 56:00 So is there certain things are being updated? Is, like, what's the state of kind of bringing, modernizing some parts of the control room? Yes, you're 100% right. The plant was designed in the '60s- Mm-hmm... 56:12 constructed in the '70s, and over the course of its life, 40-plus years, upgrades have been done on, like, the feed water controls. This computer screen you see behind you- Yeah... that's not part of the original design. 56:26 We put digital controls on the feed water, which gives us more precise control and lets us control the plant more stable. Yep. 56:36 Even though some of the hand switches look like the original analog-type hand switches, they're controlling digital functions. Oh, okay. 56:43 A couple of, three outages ago on Unit 1 and a couple of outages ago on Unit 2, like rod control, we converted it from the original analog system to it's actually digital controlled now. 56:54 So wh- okay, so that, what you just pointed out there is the actual- This-... control rods... this is the control rod selector switch. So right now they're in automatic. Uh-huh. 57:02 The plant is designed [clears throat] that if the temperature of the reactor coolant gets high or low by a degree and a half from what 57:13 the reference temperature as dictated by the steam pressure in the first chamber of the main turbine- Huh... 57:20 if those get out by a degree and a half, the rods are set up to automatically move in or out to maintain that temperature. Very cool. 57:27 [clears throat] And we can go through the different rod banks, which you see these analog gauges up here represent each control rod. Hmm. 57:36 We can cycle through that and move those manually, and we, we don't do that when we're online. That would be a function of starting the plant up or shutting the plant down. Gotcha. 57:45 If you recall, when we looked at the DCS screen, I referenced a temperature of 548.7- Yeah... or so. It's our T ave, um, which is 577, and that's that T ave function right here that Andy was talking about. 58:00 Then if you look on the screen right over here, it's 2235 PSI, and showed you that on the DCS. Yeah, yeah, yeah. 58:07 So you don't have to be in the main control room to kind of even see what's going on, but that is the pressure and the temp that- Hmm... the operators here are really keeping a close eye on. 58:18 And then we have four, these hand switches are for the four reactor coolant pumps, one on each loop hooked to each steam generator, and they are all circulating the reactor coolant about 90,000 gallons per minute. 58:31 Now, there's only 60,000 gallons of coolant in the system, so you've got four pumps turning that whole volume over, do the math on it, six times a minute. Oh my god. 58:42 [laughs] So the fuel, the actual fuel assemblies are, like, 12 feet tall. Yeah. And they're about yay square. Yeah. From the time the, the coolant enters the bottom of the core to the top, it picks up 58:57 about 30 degrees Fahrenheit. Then it transports that heat via these pumps into the primary side of the steam generators, which are separated through U-tubes from the secondary coolant. 59:11 That coolant turns to steam and goes and drives- Huh... the turbine. That steam exhausts into the condenser, which has river water flowing through it that condenses that steam back into the hot well, we call it. 59:24 It's the bottom of the condenser. It gets pumped back through that loop. So this primary water is just doing a loop, secondary water is doing a loop, and then we have the river, which we call the tertiary loop. 59:34 So this doesn't leak to that, that doesn't leak to that, and nothing goes to the environment. Okay. And this panel is f- for our chemical environment control system. So as the core ages, we'll put a brand new core in, 59:48 and we put enough reactivity, or it's manufactured with enough reactivity in it to maintain just a, a critical reaction so the reactor stays online. And so is that the, how the percentage it's enriched to? Yes. Okay. 1:00:03 All right. Yeah. Initially we'll, we moderate our reaction with boron. Mm-hmm. Boron 10 specifically, which captures neutrons and hinders the reaction. So early in core life, we'll have to borate a little occasionally. 1:00:19 And when I say occasionally, two to three times a shift of some amount. Hmm. Might be two gallons, might be eight gallons of boric acid solution. Over core life, as the enrichment gets lower through burnup, 1:00:34 we will start diluting with just primary water, which is what we're doing now. Hmm. Currently, we're putting 200 gallons of primary water in three to four times a shift. That's to maintain 100% power. 1:00:46 And as we get to the end of the core life, 1:00:49 it'll get to a point we can't dilute enough to maintain a reaction at 100%, and it'll slowly coast down, and then we'll take the turbine offline, shut the plant down, cool it down, and replace one third of the fuel with new. 1:01:01 Hmm. And that's happening in, like, in October? Yes. Did I see that right? Mm-hmm. And then this panel is all of our emergency core cooling systems. 1:01:09 So if we lose power, reactor trips, we have a loss of cooling accident, these systems take over and will automatically power back up from our on-site diesel generators, 1:01:21 sequence back on in a controlled timed fashion, and inject- 1:01:28 Coolant from a refuel water storage tank that's a borated source of water that's actually sitting outside one of the big tanks you saw coming in, and it will inject that water into the reactor coolant system and maintain the core cool. 1:01:42 And it has the ability, say if it's never happened, but if it were possible to completely shear off one of the RCS loops and all that water just dumps into the floor of the reactor building, 1:01:55 it's actually designed as a sump. The RHR pumps, the orange hand switches, will take suction from that sump and supply safety injection pumps and the charging pumps 1:02:11 go through heat exchangers and that water just stays in the containment building, recirculates, and keeps the core cool. And we can maintain that indefinitely until we get a plan to recover the plant. 1:02:23 These panels are our, this is our circulating water system, the tertiary loop I was talking about that puts cooling water through the condenser. Radiation monitoring for all the air paths leaving the plant. It's not 1:02:38 radioactive releases, but everything that is released, just normal breathing air when we're in the aux building or the containment building, is monitored in the event we had an accident. 1:02:49 And then the four panels down past there in front of Matt are the emergency diesel generators. There's four installed, four megawatts of power each. And so is this reactor one, reactor two? Correct. 1:03:05 Different ends of the room. And they're kind of like mirror images of each other. Super cool. So, so interesting. Thank you for taking the time to walk us through all that. 1:03:15 Some final thoughts and takeaways after our tour of Sequoyah's nuclear facility. First, Alex and I were both just incredibly impressed by the safety measures taken throughout the entire facility. 1:03:25 You walk in and you're met with armed guards and stringent security checks. The operators have extensive training and continue to undergo continued education. 1:03:34 The facility is designed with multiple redundancies for each system. And even the way people move throughout the facility conveys safety and security. 1:03:41 And seriously, if you want to feel more confident in the safety of nuclear energy, visit a nuclear plant. Second, you could tell everyone we interacted with genuinely loved their job. This is really not too surprising. 1:03:54 The TVA does seem like an awesome place to work. But on top of that, I'd imagine working at a nuclear facility to generate clean energy for our country is just an incredibly fulfilling career. 1:04:05 And the vibe in America seems to be shifting back to the trades, as many have kind of lost faith in our college system. Enrollment in trade schools has been on a steady climb. 1:04:15 And I believe nuclear would be a great path for many that are choosing that route. 1:04:20 And then lastly, getting to physically experience a facility like this within our region just solidified my belief that we have to lean into energy and manufacturing as much as possible. 1:04:30 We have a regional advantage and the TVA has proven that they're ready to build partnerships and invest here. Now, as for me, that was about the coolest experience that I've had. 1:04:40 And I'm just really excited to continue to lean into the momentum that has formed around American energy. You know, a future where humans flourish begins with investing in energy infrastructure now. 1:04:52 So my charge to you would be don't fall for these degrowth narratives. Abundance is within our reach. 1:04:59 So if you enjoyed this episode, please make sure to subscribe to Middle Tech as I will be putting out more content related to the future of energy over the coming months. I'm Logan Jones. Thanks for listening.